School feasibility study (UK), priced and scoped before you write the ITT.
For academy bursars and estates directors scoping a £15-40k feasibility engagement that has to clear governors and the ESFA, this site emits a defensible fee envelope, a deliverables checklist, and a green/amber/red funding-eligibility verdict - with primary citations on every figure.
- Q1Which funding route are you bidding?
- Q2What is the project?
- Q3What phase of school?
- Q4How far should the study go?
CIF does not fund feasibility upfront; the fee must be carried by the trust until award, when reasonable pre-construction costs can be recovered through the CIF award. Treat as cashflow risk [source: CIF 2025-26 applicants' guide, verified 2026-06-24].
- Site survey package (topo, measured, condition, R&D2 asbestos)Basis: RICS measured-survey, HSG264, BB103/BB104
- Options appraisal (do-nothing / refurb / rebuild / hybrid)Basis: RIBA POW 2020 Stage 0-1, HMT Green Book
- BB103/BB104 area schedule against pupil-place targetBasis: BB103 mainstream area guidelines
- Cost Plan A (RICS NRM1) against BCIS ratesBasis: RICS NRM1, BCIS Q2 2026 location factors
- Feasibility programme and risk registerBasis: HMT Orange Book, Construction Playbook
This study is scoped at £17,750-£29,000 over 6-10 weeks, with CIF eligibility AMBER. CIF does not fund feasibility upfront; the fee must be carried by the trust until award, when reasonable pre-construction costs can be recovered through the CIF award. Treat as cashflow risk [source: CIF 2025-26 applicants' guide, verified 2026-06-24].
A fee envelope, not a guess
Every band is built from day-rate x scope-day with a BCIS regional factor and cross-checked against the only two consultants who publish a rate. Extension Architecture published rate
See fee benchmarks ›A deliverables checklist a bursar can defend
Each line is tagged to its standard: BB103/BB104 area schedule, NRM1 Cost Plan A, HSG264 asbestos R&D2, RICS measured survey, RIBA Stage gates. RIBA POW 2020
See deliverables library ›A grant-eligibility verdict, in colour
Green, amber or red against CIF, SRP, SCA, VAP and the £710m Renewal & Retrofit Programme, with the rule referenced. £710m R&R
See funding routes ›RIBA Plan of Work 2020 - where a feasibility study sits
A school feasibility study almost always spans RIBA Stages 0 to 2. Stage 0 frames the strategic question (do we even need a building?), Stage 1 captures the brief and commissions surveys, and Stage 2 takes a concept design forward to a planning pre-application and a Cost Plan A. Bidding into CIF Section C requires at least Stage 1 evidence; the strongest CIF bids carry Stage 2 outputs. CIF programme page
Six canonical brief templates
Choose the closest template to your project. Each one carries a worked fee envelope, the deliverables checklist, the RIBA stage span, and a paste-ready ITT block.